\xe2\x80\xa2 Prepare Fortnightly Progress report to client and consultant. \xe2\x80\xa2 Supervising, monitoring and coordinate casting work with subcontractor and plant concrete. \xe2\x80\xa2 Planning and coordinate with Client and subcontractor to do inspection before casting work. \xe2\x80\xa2 Record all activity and progress on site (Daily Site Report) \xe2\x80\xa2 Make site memo to subcontractor \xe2\x80\xa2 Do backcharge document to subcontractor if necessary. \xe2\x80\xa2 To supervising, monitoring and coordinate with subcontractor for structure work with the drawing \xe2\x80\xa2 Day to day management of the site, including supervising and monitoring the site labour force and the progress of all subcontractors. \xe2\x80\xa2 Plan the work and efficiently organize the plan and site facilities in order to meet agreed deadlines \xe2\x80\xa2 Check discrepancy drawing structural, architectural & M&E. If have, propose suitable method for problem solving. \xe2\x80\xa2 Planning, supervising, monitoring organising daily site activities \xe2\x80\xa2 Manage construction projects, make sure they are scheduled and built in according to specification, drawing plan and follow ISO quality management system. \xe2\x80\xa2 Liaise with client, sub-contractor, labour, consultant architect and structural & M&E. \xe2\x80\xa2 Overseeing quantity and quality control, road traffic, lifting material, health and safety matters on site. \xe2\x80\xa2 Resolving design and technical problems. \xe2\x80\xa2 Find practical or useful solutions to keep the projects run. \xe2\x80\xa2 Design, evaluate, inspect, and maintain the structure elements in its natural environment. \xe2\x80\xa2 Suggest and pioneering new methods or process to improve work on site. \xe2\x80\xa2 Scan & email records, reports, inspections & information to consultant \xe2\x80\xa2 Resolve client complaint, technical, safety and site logistic issues. \xe2\x80\xa2 Record piling driving each point. \xe2\x80\xa2 Inspection with clerk of work (COW) or representative from consultant \xe2\x80\xa2 Send progress report to superior and consultant if needed 15. Calculate balance material, future material want use and order. 16. Scheduling material and equipment purchases and deliveries. Other \xe2\x80\xa2 Any other tasks as assigned by the Management and Superior from time to time \xe2\x80\xa2 Prepare Fortnightly Progress report to client and consultant. \xe2\x80\xa2 Supervising, monitoring and coordinate casting work with subcontractor and plant concrete. \xe2\x80\xa2 Planning and coordinate with Client and subcontractor to do inspection before casting work. \xe2\x80\xa2 Record all activity and progress on site (Daily Site Report) \xe2\x80\xa2 Make site memo to subcontractor \xe2\x80\xa2 Do backcharge document to subcontractor if necessary. \xe2\x80\xa2 To supervising, monitoring and coordinate with subcontractor for structure work with the drawing \xe2\x80\xa2 Day to day management of the site, including supervising and monitoring the site labour force and the progress of all subcontractors. \xe2\x80\xa2 Plan the work and efficiently organize the plan and site facilities in order to meet agreed deadlines \xe2\x80\xa2 Check discrepancy drawing structural, architectural & M&E. If have, propose suitable method for problem solving. \xe2\x80\xa2 Planning, supervising, monitoring organising daily site activities \xe2\x80\xa2 Manage construction projects, make sure they are scheduled and built in according to specification, drawing plan and follow ISO quality management system. \xe2\x80\xa2 Liaise with client, sub-contractor, labour, consultant architect and structural & M&E. \xe2\x80\xa2 Overseeing quantity and quality control, road traffic, lifting material, health and safety matters on site. \xe2\x80\xa2 Resolving design and technical problems. \xe2\x80\xa2 Directly liaise with site manager to propose practical or useful solutions to keep the projects run. \xe2\x80\xa2 Design, evaluate, inspect, and maintain the structure elements in its natural environment. \xe2\x80\xa2 Suggest and pioneering new methods or process to improve work on site. \xe2\x80\xa2 Scan & email records, reports, inspections & information to consultant \xe2\x80\xa2 Resolve client complaint, technical, safety and site logistic issues. \xe2\x80\xa2 Record piling driving each point. \xe2\x80\xa2 Inspection with clerk of work (COW) or representative from consultant \xe2\x80\xa2 Send progress report to superior and consultant if needed 15. Calculate balance material, future material want use and order. 16. Scheduling material and equipment purchases and deliveries. \xe2\x80\xa2 Liaise with client representative, site manager and external parties to plan and resolve work scope Other \xe2\x80\xa2 Any other tasks as assigned by the Management and Superior from time to time \xe2\x80\xa2 Prepare ISO documentation related to job scope. VISION: To become a preferred contractor in construction. A company that our customers want to work with and our employees are proud to work for. MISSION: Our pledge is to develop a role model that delivers a quality workmanship while maintaining professionalism and integrity in our relationship with stakeholders. CORE VALUES (3S) SAFETY: We place highest priority in protecting the health and safety at workplace in compliance with the local requirement SYNERGY: We work closely with stakeholders without compromising professionalism and integrity to achieve on-time completion with a high quality workmanship SUSTAINABILITY: We improve the quality of life in communities where we work by respecting local cultures and protecting the environment Diploma / Advanced Diploma / Higher Graduate Diploma / DVM / DKM Level 4 / DLKM Level 5
Beware of fraud agents! do not pay money to get a job
MNCJobz.com will not be responsible for any payment made to a third-party. All Terms of Use are applicable.